Business Finance Homework Help

BUS 1099 CC House Renovation & Scope Variance Threshold Project

 

1. Assignment Background and Description

To complete this assignment successfully, you will need to utilize the project idea and project charter developed in assignment # 1.

2. Project Management Plan

With your project charter approved, it is now time to start creating your project management plan. Part of this work is to create a container to hold all the components of your plan.

3. High-Level Requirements

Create a MS Word document with sections for each component of the plan. (See Week 1 for more detailed instructions on creating this document) Your plan should include all the items from Table 4.1 in the PMBOK (v6).

Project Management Plan that includes:

  • • Scope baseline
  • • Schedule baseline
  • • Cost baseline
  • • Any additional Project Manager’s Book of Forms templates for documents in table 4.1

Updated Project Charter: The charter must include all the elements in section 4.1.3 of the PMBOK. You must use the charter template from the Book of Forms as a starting point, but may tailor it (add components, not delete) to better suite your specific case scenario.

Updated Assumption Log: You also need to include an assumption log. At this point, the assumption log will contain any assumptions you have had to make in order to create your charter. The assumptions need to be clearly stated and be actionable. The actions should be assignable as tasks to those responsible for the assumption to be turned into a fact.

Group Activity Log: All group members must contribute equally in the assignment submission. Please see the assignment rubric for tools that can be used to demonstrate group participation.

4. Deliverables

A word document with two sections: 1. Project Management Plan 2. Project Documents. Use the rubric posted on the Moodle page as a guide to the expected contents. Please ensure you cite the sources of information in your assignment. You can use this site as a guide on how to properly cite your sources: http://www.plagiarism.org/article/how-do-i-cite-so… 2

A single MS Word document containing a “Title Page”, a “Table of Contents” generated by MS Word, a “Business Case”, a completed “Project Charter”, and an “Assumption Log”. See Moodle for templates of each document.

NO PLAGARISM

NEED BOTH 2.1 and sample project schedule below