Business Finance Homework Help

JWU MGMT Cupcakes Assembly Line Paper

 

Assembly Line

Assignment:

This week you are going to design and balance an assembly line. We are going to take the simple task of making

cupcakes, break the work up into stations, calculate cycle times for each station, balance the work load between

stations, and calculate the efficiency of the operation. The steps for the assignment are below.

  • Design an assembly line to manufacture cupcakes from scratch.
  • Balance the assembly line.
  • Measure the efficiency

Assignment format:

The best way to do this is in Excel. You can use cell borders and insert shapes to build the assembly line. Use the

math functions in Excel to balance your line and calculate efficiencies.

The final report should be in Word in APA format. Use the following sections:

  • Introduction – how you set up the line, what is done at each station and cycle time. You can cut and

paste in your diagram from Excel

  • Line Balance – what you did to balance the line, you can copy in your Excel work if needed.
  • Efficiency – provide and analyze the operational efficiency.