Estimating Project
Due Date:
Assignment: Assemble a detailed construction estimate to construct the Medical Clinic as per the attached
plans and specifications. Bids will be opened publicly in class. Detailed estimates shall be
submitted in spreadsheet form with costs broken down into the 16 divisions as per the Masterformat
coding system. All assumptions shall be listed on a separate sheet and attached to the estimate.
It is expected that your detailed estimate will be a complete estimate which covers every item
necessary to construct this facility. As part of the proposal, you will submit alternate #1 for the
add or deduct amount to install the foundation as per sheet S-1A and alternate #2 for the add or
deduct amount to construct masonry walls as per sheet S-1B in lieu of the wood framing as
specified. In addition you will submit an alternate price for each of alternate items #3, 4, and 5 as
indicated in the project specifications. Please disregard the soils report section, it is not applicable.
I have made some minor modifications to the plans by hand in an effort to clarify some items and
make others more applicable to this region. In your estimate in the appropriate sections, please carry
a line item allowance of $50,000 for medical equipment and $2,300 for lighting fixtures.