Engineering Homework Help

EMGT 5231 System Development Life Cycle Summary

 

  • Instruction in PPT slide (last slide in Week 1-2 Systems Engineering Process XS 7th Ed.ppt Week 1-2 Systems Engineering Process XS 7th Ed.ppt provides a Vee chart for a SEP. Read the PDP on Exhibit 2-2 attached below and Use that chart and map each activities in the SEP to the PDP. I believe that you can summarize this to two columns: From (activities in SEP) and To (six phases: planning, concept development, system-level design, detail design, testing and refinement, and production ramp-up).
  • Do your own research and describe advantages and disadvantages of the Vee chart, a waterfall model and a spiral process model.
  • Summarize all on 3 to 4 pages.