Overview: For this assignment, you will continue to build on your Labor Hours spreadsheet to examine the actual costs of a business project.
Prompt: Using the Labor Hours spreadsheet, expand the table in the Data tab to capture the actual cost of this project by performing the following steps:
- Total the complete labor cost.
- a) Add a column that totals the labor for each employee, given the added criteria. (See the last two bullets in the scenario box below.)
- b) Total the complete labor cost.
- Think about what additional costs would contribute to the overall cost of the project.
- a) Below is a list to consider. Add additional columns to capture these costs. (Note: Not all of these should be included; read each bullet carefully.)
- The project is located 30 miles from the office, and the company pays the employees .54¢ per mile to travel to the worksite and back.
- You are using $1,000 in materials left over from another project.
- Because the worksite is in a remote location, a portable office with restrooms had to be leased at a cost of $300 per day.
- At the cost of $350 per employee, the company provides all employees with uniforms and safety equipment. This equipment is replacedon a yearly basis.
- The company pays for a $60 food platter to be delivered to the site every day to feed all of the workers.
- Fuel to run the generator in the portable office costs $10 per day and is included in the lease agreement.
- A security service had to be contracted by the company to safeguard the worksite 24 hours a day at the cost of $720 per day.
- b) Total the entire project cost.
- a) Below is a list to consider. Add additional columns to capture these costs. (Note: Not all of these should be included; read each bullet carefully.)
- Create a new tab titled Actual. Provide a summary statement that recommends reducing costs without lowering labor rates.